Year 1923
|
Office of Secretary PWD and Chief Engineer was transferred from Allahabad to Lucknow.
|
6 May, 1924
|
‘United Provinces Engineers' Association was formed by departmental engineers at Kanpur on May ‘06.
|
Year 1927
|
Public Health Department was established separately from PWD and its control was given to Civil Council.
|
Year 1931
|
Railway operations were taken out from the PWD.
|
Year 1933
|
Mr. Rai Bahadur Chhuttan Lal was appointed as the first Indian Chief Engineer.
|
Year 1938
|
Irrigation works were taken out from PWD and Irrigation Department established.
|
Year 1940-41
|
After the above mentioned restructuring, the PWD was left with only 01 Chief Engineer, 02 Superintending, Engineers and 07 Executive Engineers.
|
Year 1944
|
Due to World War II the pace of works under the Military Engineering (M.E.S.) increased and from 1944-45 there were 02 Chief Engineers, 05 Superintending Engineers and 22 Divisional Officers.
|
Year 1945
|
Thomson Engineering College Roorkee was again brought under the control of the department.
|
Year 1946
|
A research institute was also set up under the department.
|
Year 1947
|
After independence, the name of the province became Uttar Pradesh.
|
Year 1948
|
Thomson Engineering College Roorkee was made a university and brought under the control of education department.
|
Year 1963
|
Departmental Construction Unit (D.C.U.) was established on an experimental basis to carry out works directly under departmental engineers.
|
Year 1965
|
Housing Development Board was established to speed up the housing schemes of government.
|
Year 1970
|
Rural Engineering Service and Minor Irrigation Department were established to give acceleration rural development.
|
Year 1972
|
Uttar Pradesh State Bridge Corporation established for the speedy construction of bridges.
|
Year 1972
|
L.S.G.E.D. was renamed to Jal Nigam.
|
Year 1976
|
Based on the success of the Bridge Corporation, U.P. Rajkiya Nirman Nigam was established for building construction on departmental pattern, and it added to the glory of the state in the area of building construction.
|
Year 1976
|
The State Electricity Board was constituted for electricity production and distribution. In Irrigation Department 'Tube well Corporation’ was formed. In Jal Nigam Construction & Design Services was formed for consultancy.
|
Year 1980
|
Four Zonal offices namely Western, Central, Eastern and Hill region, Meerut was created for speedy and better supervision under chief engineers with head quarter at Meerut, Lucknow, Varanasi and Garhwal respectively.
|
02.11.1983
|
Chief Engineer (Building) was posted for the building works under department in November.
|
27.02.1985
|
Gorakhpur zone was created with headquarter at Gorakhpur from Eastern region Varanasi in the month of February.
|
01.06.1985
|
Chief Engineer (National Highway) was posted for National Highway Works with P.W.D. under State In June.
|
04.06.1985
|
Northwest zone with headquarter at Bareilly from Western zone and South-Central zone with headquarter at Kanpur from Central zone was created in June.
|
01.08.1987
|
Chief Engineer (E/M) was posted for procurement and maintenance of departmental machineries required for construction and supervision works in August.
|
07.09.1987
|
Jhansi zone from South-Central zone, Agra zone from Northwest zone and Faizabad zone from Gorakhpur zone was created and Chief Engineers were posted in September.
|
10.04.1990
|
The name Sarvajanik Nirman Vibhag was changed to Lok Nirman Vibhag in April.
|
05.12.1990
|
A post of Chief Engineer (Level-1) was created at the headquarters Lucknow for monitoring works of the externally aided World Bank (road project) in December.
|
11.10.1990
|
Legal Cell established in all Zonal Chief Engineers’ Office in October.
|
02.11.1994
|
Chief Engineer (Complain) was posted in November.
|
12.03.1996
|
The posts of Managing Director of UP Rajkiya Nirman Nigam and Bridge Corporation were reserved for Chief Engineer of PWD (Level-2) in March.
|
02.08.1996
|
Moradabad zone (from Northwest zone) and Allahabad zone (from South central Zone) were established in newly created revenue commissionaires in August.
|
Year 2000
|
As a result of the formation of Uttarakhand state, the Garhwal and Kumaon regions were transferred to Uttrakhand with proportionate posts and the hill cadre was abolished from department.
|
09.01.2001
|
For PMGSY works dedicated divisions were named as per the requirement of Government of India in January.
|
25.02.2005
|
Engineer-in-Chief for Development Rural Roads, Designs and Planning were posted for speedy and better monitoring the Engineer-in-Chief Development also nominated as H.O.D.
|
28.08.2008
|
Two temporary posts of Chief Engineer (Level-2) in PWD created in August.
|
10.09.2013
|
The post of Chief Engineers (Indo-Nepal border) has been created.
|